Nearly 42 Million Beidou Terminals: What Efficiency Is the Port Actually Buying?

11/17 2026 528

Author | Jing Yu. For more financial information | BT Finance Data Connect. Main text: 2,458 words in total. Estimated reading time: 9 minutes

Beihai Terminal at Beibu Gulf Port has moved bulk cargo tallying from the site to the back office. Some of the work that used to require on-site checks can now be completed using drone surveying, image recognition, and Beidou high-precision positioning, with staff monitoring multiple operations simultaneously from the back office. Beibu Gulf Port disclosed that after this system was implemented, 3 to 4 tally clerks were cut from the on-site staffing per shift, saving 1.3 million to 1.7 million yuan in annual labor costs. This is the operating result of the entire system. Beidou's role in it is to connect location data into the tallying process.

According to a report from Cailianshe on November 17, the "2026 China Beidou Industry Development Index Report" released in Beijing by the China Satellite Navigation and Positioning Association shows that as of the first half of 2026, the number of various Beidou terminal device applications in China was close to 42 million units, nearly 9 million units more than the same period last year, an increase of about 27%. As more and more terminals receive positioning signals, procurement companies still need to ask a more specific question: once location data is sent to the back office, exactly which part of on-site work can be eliminated?

01

42 Million Units: First, Clarify What Is Being Counted

The figure of nearly 42 million units is the number of device applications stated in the report, and the statistics explicitly exclude consumer electronics. The increase of nearly 9 million units over the same period last year describes the difference in the number of applications between two points in time, and cannot be used to calculate terminal sales, replacement scale, or service renewals for the current period. The report also discloses that the comprehensive application penetration rate of Beidou exceeds 90%. The public news brief does not explain the detailed denominator of this indicator, so citations should be limited to the report's methodology.

The same report also lists consumer-side data. In the first half of the year, domestic smartphone shipments reached 124 million units, with more than 98% supporting Beidou positioning; passenger vehicle shipments equipped with Beidou terminals were about 10 million units, and sales of electric bicycles with Beidou positioning functions reached 26 million units. Here, shipments are used for phones and cars, while sales are used for electric bicycles. These three items are suitable for observing the spread of positioning functions into consumer products, but they cannot be directly merged into the 42 million units, nor can shipment and sales figures be used to infer the number of daily positioning calls.

For terminal manufacturers, these numbers show that devices compatible with Beidou are becoming increasingly common. For port procurement departments, the fact that a device can already provide positioning is only one condition in selection. What carries more weight is which previously on-site task can now be completed in the back office, how many people need to return to the site when anomalies occur, and whether the entire system can continue operating under normal production conditions. Beihai Terminal provides a case that allows this account to be broken down.

02

How One Set of Coordinates Saves One On-Site Verification

Bulk cargo entering and leaving a port requires tallying, which simply put means verifying relevant information about the cargo during handover. Public reports from Beibu Gulf Port show that Beihai Terminal connects automatic drone surveying, AI recognition, Beidou high-precision positioning, and the production system, allowing tally personnel to conduct centralized monitoring in the back office. The value of location data lies in its ability to correspond to specific operation records. If the system only displays a coordinate, staff still have to find other materials to confirm which operation area this is and which business record it corresponds to. Only when location, images, and operation information can be cross-checked in the same system do back-office personnel have the conditions to take over part of the on-site work.

The annual figure of 1.3 million to 1.7 million yuan disclosed by the company measures the **labor cost savings** after implementation. It does not separately account for the contribution of Beidou terminals, nor does the case disclose the full construction cost and annual operation and maintenance expenditures. Treating this figure directly as the system's annual net benefit would omit upfront equipment and system upgrades, as well as subsequent maintenance, manual review, and anomaly handling. The reduction in tally clerk staffing per shift also cannot be directly converted into a reduction in the number of employees. Some labor may be transferred to other positions, and only some cost savings will actually be reflected in expenditures.

The value of this case for port operators is that it provides an indicator that can be compared before and after procurement. List the on-site working hours, back-office review hours, and rework counts for the same type of operation before and after the upgrade, and then look at business volume and shifts alongside them. If on-site staffing per shift decreases but a large amount of verification work is added in the back office, the two parts need to be calculated together. If the same team can steadily handle more business, it is also necessary to see whether the time saved is actually used for other operations. Only in this way can "more precise device positioning" be translated into results that the finance department can verify.

03

Buy Terminals Once, or Continuously Buy Operational Capability?

When it is necessary to accurately determine which operation point a cargo or device is located at, the procurement list may include terminals, positioning augmentation services, business system interfaces, installation and commissioning, and operation and maintenance. The smart port technical guidelines issued by the Ministry of Transport also discuss Beidou high-precision positioning together with communications, LiDAR, and video technologies in integrated applications to support equipment positioning and production scheduling. Ports face different conditions. Two terminals may both provide coordinates in open environments, but in locations blocked by equipment and storage yards, buyers must verify whether they can stably support the same operation.

Therefore, before comparing quotations, a type of recurring operation can first be selected for validation. Buyers and suppliers should first agree on whether the problem to be solved is that verification personnel must walk to the site, that anomaly rechecks are too slow, or that equipment locations and scheduling instructions often fail to match. Then specify in which areas and on which shifts to trial it, and record the number of valid operations, the number of manual reviews, and the time from anomaly detection to completion of handling. If acceptance only looks at how many devices were installed, the supplier can complete this item upon delivery; if acceptance looks at whether the workflow runs through, both parties must clearly discuss interfaces, service response, and takeover methods during downtime in advance.

Costs should also be calculated within the same scope. Some quotations bundle terminals and installation together, with system integration and subsequent services paid separately; some delivery plans include a longer operation and maintenance period but require the port to assign interface developers. When comparing, equipment, software, personnel training, and subsequent repairs should be included in the same cycle. On the benefit side, what can be directly verified can first use actual reductions in overtime, outsourced shifts, or duplicate review hours; estimated efficiency improvements should be listed separately with a validation period. Only with these data is it possible to estimate how long a upgrade will take to pay back. Beihai's savings provide a case, but other ports still need to calculate again using their own shifts and labor structures.

04

Whether Orders Can Be Renewed Depends on Whether the Business System Is Still in Use

Terminal deployment increases sales opportunities for hardware manufacturers. For companies providing high-precision positioning, scheduling, and system integration, whether they can charge service fees later depends on whether customers continue to use location data for production. If a terminal is installed at a port but operators return to phone communication and manual registration when anomalies occur, the number of installations may increase, but service usage may not keep up. Even if another port upgrades only one operation area first, as long as it is used every shift and anomalies are handled by someone, there is a basis for judging whether to expand to other areas next.

Records that can verify sustained demand can also be found in procurement contracts. Initial installation and acceptance correspond to equipment delivery, while subsequent operation and maintenance contracts, service renewals, or additional purchases correspond to continued use. To judge whether a solution can be replicated, it is also necessary to see how many interfaces need to be changed to connect a new operation area, how much time training takes, and whether similar results can be achieved with the same shifts. A project running through once is a reference for the next quotation, but specific revenue and profit still depend on contract scope, delivery, and costs.

Nearly 42 million units records how large the scale of Beidou expansion has become. At a port procurement meeting, what can best drive the next order is that after moving a routine operation from the site to the back office, it can be done accurately for several consecutive shifts, anomalies can be traced, and verifiable savings are left on the books.

This article is an original article by BT Finance. Without permission, it may not be used, copied, disseminated, or adapted without authorization. If it constitutes infringement, legal liability will be pursued.

Solemnly declare: the copyright of this article belongs to the original author. The reprinted article is only for the purpose of spreading more information. If the author's information is marked incorrectly, please contact us immediately to modify or delete it. Thank you.